ENKA

CLIENT : BOTAŞ
DESCRIPTION : Capacity increase for K1 and K2 unit of compressor station
CONTRACTOR : ENKA TEKNİK
SUBCONTRACTOR SARIKAYA CONSTRUCTION
DATE : 13.04.1998 – 31.10.1998
SCOPE
  • Pipe disassembly 35 Tons
  • Equipment disassembly 135 Tons
  • Pipe assembly 69 Tons
  • Equipment erection 224 Tons
  • Steel consturction manufacturing and installation 11 Tons
  • Sand blasting and painting 126 m2
  • Man hour works 5102 Man hour

Capacity increase works of CS 1-K3 Compressor

CLIENT : BOTAŞ
DESCRIPTION : Capacity increase works of CS 1-K3 Compressor
CONTRACTOR : ENKA TEKNİK
SUBCONTRACTOR : SARIKAYA CONSTRUCTION
DATE : 21.04.2000 – 26.09.2000
SCOPE Pipe assembly and equipment erection