ENKA
CLIENT
: BOTAŞ
DESCRIPTION
: Capacity increase for K1 and K2 unit of compressor station
CONTRACTOR
: ENKA TEKNİK
SUBCONTRACTOR
: SARIKAYA CONSTRUCTION
DATE
: 13.04.1998 – 31.10.1998
SCOPE
- Pipe disassembly 35 Tons
- Equipment disassembly 135 Tons
- Pipe assembly 69 Tons
- Equipment erection 224 Tons
- Steel consturction manufacturing and installation 11 Tons
- Sand blasting and painting 126 m2
- Man hour works 5102 Man hour
Capacity increase works of CS 1-K3 Compressor
CLIENT
: BOTAŞ
DESCRIPTION
: Capacity increase works of CS 1-K3 Compressor
CONTRACTOR
: ENKA TEKNİK
SUBCONTRACTOR
: SARIKAYA CONSTRUCTION
DATE
: 21.04.2000 – 26.09.2000
SCOPE
Pipe assembly and equipment erection
CLIENT | : BOTAŞ |
DESCRIPTION | : Capacity increase for K1 and K2 unit of compressor station |
CONTRACTOR | : ENKA TEKNİK |
SUBCONTRACTOR | : SARIKAYA CONSTRUCTION |
DATE | : 13.04.1998 – 31.10.1998 |
SCOPE |
|
Capacity increase works of CS 1-K3 Compressor
CLIENT | : BOTAŞ |
DESCRIPTION | : Capacity increase works of CS 1-K3 Compressor |
CONTRACTOR | : ENKA TEKNİK |
SUBCONTRACTOR | : SARIKAYA CONSTRUCTION |
DATE | : 21.04.2000 – 26.09.2000 |
SCOPE | Pipe assembly and equipment erection |