MERAM ELEKTRİK DAĞITIM A.Ş ( MEDAŞ )

CLIENT : MERAM ELEKTRİK DAĞITIM A.Ş ( MEDAŞ )
DESCRIPTION : MAINTENANCE WORK OF OPERATIONS (KIRŞEHİR 1 – KIRŞEHİR 2 – MUCUR )
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 01.04.2016 – 31.12.2017
SCOPE MAINTENANCE WORKS OF ELECTRICAL OPERATIONS………………………… 9 MONTH + 1 YEAR + 1 YEAR

UET URAN ENDÜSTRİ TESİSLERİ İNŞAAT VE TİCARET A.Ş

CLIENT : UET URAN ENDÜSTRİ TESİSLERİ İNŞAAT VE TİCARET A.Ş.
DESCRIPTION : 920 MW KIRIKKALE CCPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR           
DATE : 15.01.2016– 30.12.2016
SCOPE BOP EQUIPMENT ERECTION 1.424 TON

İZMİR DEMİR ÇELİK SANAYİ A.Ş

CLIENT : İZMİR DEMİR ÇELİK SANAYİ A.Ş.
DESCRIPTION : MANUFACTURING AND ERECTION OF ACID TANK
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 07.12.2015– 15.03.2016
SCOPE 25 TON CAPACITY ACID TANK x 1

KESİR ENGINEERING

Georgian Construction Site Pipe work man          

 CLIENT : KESİR ENGINEERING
DESCRIPTION : EMPLOYEE PROCUREMENT FOR GEORGIA PROJECT
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 01.08.2015– 31.09.2015
SCOPE Employee procurement for piping works         1500 man hour

KARDEN SEMBOL PROJECT

26)   CLIENT : İLERİ ALÜMİNYUM
DESCRIPTION : Parapet works of KARDEN SEMBOL PROJECT
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 03.07.2015– 31.12.2015
SCOPE Parapet ………………………… 14 km

TAHA CCPP2 EXHAUST BY PASS SYSTEM PROJECT

TAHA CCPP2 EXHAUST BY PASS SYSTEM PROJECT

CLIENT : ENPRO A.Ş
DESCRIPTION : TAHA CCPP2 EXHAUST BY PASS SYSTEM PROJECT
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 01.04.2015– Ongoing
SCOPE Steel Assembly ………………………… 202 Ton

 

ALARKO

DHP-CCR Unit     

CLIENT : KIRIKKALE TÜPRAŞ REFINERY
DESCRIPTION : DHP-CCR Unit
CONTRACTOR : ALSİM ALARKO & GAMA
SUBCONTRACTOR : SARIKAYA CONSTRUCTION & ALARKO DEPARTMENT CHIEF
DATE : 01.01.2006– 01.09.2008
SCOPE
  • Pipe manufacturing, assembly and testing
  • Manufacturing, assembly and test of T-4216 (23.540 m3), T-4217 (10.786 m3), T-4218 (15.780 m3) tanks
  • Steel construction manufacturing and installation Equipment erection

    İsolation

Kırklareli Altek CCPP (89 MW)

CLIENT : ALTEK ALARKO
DESCRIPTION : Kırklareli Altek CCPP (89 MW)
CONTRACTOR : ALSİM ALARKO
SUBCONTRACTOR : MECHANICAL CHIEF
DATE : 01.01.2006– 01.09.2008
SCOPE
  • Equipment erection
  • Piping
  • Manufacturing and assembly of tanks (800 m3 and 4000 m3)
  • Manufacturing and assembly of ventilation duct and equipment

    İsolation

   

 

Hydro Power Plant (76 MW)

CLIENT : ALTEK ALARKO
DESCRIPTION : Hydro Power Plant (76 MW)
CONTRACTOR : ALSİM ALARKO
TITLE : MECHANICAL CHIEF
DATE : 01.03.2012 – 31.01.2015
SCOPE
  • Manufacturing and assembly of penstok pipe  2.300 Ton
  • Dum Shutters 245 Ton
  • Valve 13 Ton
  • Monorail crane (110 t) 1 Adet
  • Monorail crane (15 t) 1 Adet
  • Portal crane 3 Adet
  • Pelton Türbine (38MW X 2)  2  Adet
  • Auxiliary system for Power House 1 Set
  • Steel covering of tunnel (Ø 3100mm) 720 metre

 

 

Maintence works of KIRKLARELİ CCPP           

CLIENT : ALTEK ALARKO
DESCRIPTION : Maintence works of KIRKLARELİ CCPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 23.02.2015 – 30.05.2015
SCOPE : Employee procurement for maintenance works 5760 man hour

 

 

Erection of vacuum pump of KIRKLARELİ CCPP      

 CLIENT : ALTEK ALARKO
DESCRIPTION : Erection of vacuum pump of KIRKLARELİ CCPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 05.08.2015 – 05.09.2015
SCOPE : Equipment erection x 2

 

 

FISH ROAD MANUFACTURING AND ERECTION FOR ALARKO KARAKUZ HPP

CLIENT : ALTEK ALARKO
DESCRIPTION : FISH ROAD MANUFACTURING AND ERECTION FOR ALARKO KARAKUZ HPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR
DATE : 08.10.2015 – 31.12.2015
SCOPE : MANUFACTURING AND ERECTION

NUROL MAKİNA

Manufacturing and assembly of tanks, pipes and steel construction

 

İŞVEREN : TEPE GROUP
İŞİN ADI : Manufacturing and assembly of tanks, pipes and steel construction
MÜTEAHHİT : NUROL MAKİNA
TARİH : 18.02.2004 – 01.11.2005
KAPSAM
  • Manufacturing and assembly works of fuel oil and water tank
  • Roof steel construction intallation
  • Pipe manufacturing and assembly works

 

KULAK iNŞAAT

Equipment erection and pipe assembly works of CS-1 Dogubeyazit compressor station   

CLIENT : BOTAŞ
DESCRIPTION : Equipment erection and pipe assembly works of CS-1 Dogubeyazit compressor station
CONTRACTOR : KULAK iNŞAAT
DATE : 18.11.2002 – 27.10.2004
SCOPE
  • Underground and aboveground pipe assembly 
  • Equipment erection 
  • İsolation works

 

 

TEKNOTES

Pipe manufacturing and assembly of ÇAN FOSSIL FUEL PLANT

İŞVEREN : EÜAŞ
İŞİN ADI : Pipe manufacturing and assembly of ÇAN FOSSIL FUEL PLANT
MÜTEAHHİT : TEKNOTES
TARİH : 15.05.2002 –31.12.2003
KAPSAM
  • Manufacturing of CS Pipe 1.358 Ton 
  • Assembly of CS Pipe 536 Ton
  • Manufacturing of SS Pipe 13 Ton
  • Assembly of AS Pipe 175 Ton
  • Manufacturing and assembly of support 500 Ton