TEKNOTES

Pipe manufacturing and assembly of ÇAN FOSSIL FUEL PLANT

İŞVEREN : EÜAŞ
İŞİN ADI : Pipe manufacturing and assembly of ÇAN FOSSIL FUEL PLANT
MÜTEAHHİT : TEKNOTES
TARİH : 15.05.2002 –31.12.2003
KAPSAM
  • Manufacturing of CS Pipe 1.358 Ton 
  • Assembly of CS Pipe 536 Ton
  • Manufacturing of SS Pipe 13 Ton
  • Assembly of AS Pipe 175 Ton
  • Manufacturing and assembly of support 500 Ton