ALARKO

DHP-CCR Unit     

CLIENT : KIRIKKALE TÜPRAŞ REFINERY
DESCRIPTION : DHP-CCR Unit
CONTRACTOR : ALSİM ALARKO & GAMA
SUBCONTRACTOR : SARIKAYA CONSTRUCTION & ALARKO DEPARTMENT CHIEF
DATE : 01.01.2006– 01.09.2008
SCOPE
  • Pipe manufacturing, assembly and testing
  • Manufacturing, assembly and test of T-4216 (23.540 m3), T-4217 (10.786 m3), T-4218 (15.780 m3) tanks
  • Steel construction manufacturing and installation Equipment erection

    İsolation

Kırklareli Altek CCPP (89 MW)

CLIENT : ALTEK ALARKO
DESCRIPTION : Kırklareli Altek CCPP (89 MW)
CONTRACTOR : ALSİM ALARKO
SUBCONTRACTOR : MECHANICAL CHIEF
DATE : 01.01.2006– 01.09.2008
SCOPE
  • Equipment erection
  • Piping
  • Manufacturing and assembly of tanks (800 m3 and 4000 m3)
  • Manufacturing and assembly of ventilation duct and equipment

    İsolation

   

 

Hydro Power Plant (76 MW)

CLIENT : ALTEK ALARKO
DESCRIPTION : Hydro Power Plant (76 MW)
CONTRACTOR : ALSİM ALARKO
TITLE : MECHANICAL CHIEF
DATE : 01.03.2012 – 31.01.2015
SCOPE
  • Manufacturing and assembly of penstok pipe  2.300 Ton
  • Dum Shutters 245 Ton
  • Valve 13 Ton
  • Monorail crane (110 t) 1 Adet
  • Monorail crane (15 t) 1 Adet
  • Portal crane 3 Adet
  • Pelton Türbine (38MW X 2)  2  Adet
  • Auxiliary system for Power House 1 Set
  • Steel covering of tunnel (Ø 3100mm) 720 metre

 

 

Maintence works of KIRKLARELİ CCPP           

CLIENT : ALTEK ALARKO
DESCRIPTION : Maintence works of KIRKLARELİ CCPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 23.02.2015 – 30.05.2015
SCOPE : Employee procurement for maintenance works 5760 man hour

 

 

Erection of vacuum pump of KIRKLARELİ CCPP      

 CLIENT : ALTEK ALARKO
DESCRIPTION : Erection of vacuum pump of KIRKLARELİ CCPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR :
DATE : 05.08.2015 – 05.09.2015
SCOPE : Equipment erection x 2

 

 

FISH ROAD MANUFACTURING AND ERECTION FOR ALARKO KARAKUZ HPP

CLIENT : ALTEK ALARKO
DESCRIPTION : FISH ROAD MANUFACTURING AND ERECTION FOR ALARKO KARAKUZ HPP
CONTRACTOR : HDE PROJECT& ENGINEERING
SUBCONTRACTOR
DATE : 08.10.2015 – 31.12.2015
SCOPE : MANUFACTURING AND ERECTION